Green Energy Revolution

Smart Solar
Power Solutions

Eliminate your electricity bills and embrace energy independence with our government-approved, high-efficiency solar power systems.

Modern Solar Panel Installation

Tier-1 Technology

High-Efficiency PV Modules

Decision Guide

Which Solution is Right for You?

Compare On-Grid Solar, UPS Systems, and Hybrid Solutions to find the perfect fit for your power needs and budget.

On-Grid Solar

Best for Bill Savings

Initial Cost
₹35K-50K/kW
Operational Cost
Near Zero
Backup Duration
Grid Dependency
Required
Maintenance
Minimal
ROI Timeline
4-5 Years
Govt. Subsidy
Eco Friendly
BEST VALUE

Hybrid Solution

Best Overall Experience

Initial Cost
₹60K-80K/kW
Operational Cost
Very Low
Backup Duration
8-24 Hours
Grid Dependency
Optional
Maintenance
Low
ROI Timeline
5-7 Years
Govt. Subsidy
Eco Friendly

Normal UPS

Basic Power Backup

Initial Cost
₹8K-15K/kVA
Operational Cost
Medium
Backup Duration
2-8 Hours
Grid Dependency
Required
Maintenance
Medium
ROI Timeline
N/A
Govt. Subsidy
Eco Friendly
* Estimated costs based on standard installations in your local area. All plans include 100% brand warranty.
Smart ROI Estimator

Calculate Your Smart Energy Investment

Our algorithm automatically suggests the most efficient system size based on your current TANGEDCO bill slab.

5,000/ Month
₹1,000₹50,000+
5 kWPlanned
1 kW (Home)50 kW (Industrial)

CO2 Offset

7.5 Tons/Yr

Trees Equivalent

337 Trees

Payback Period

5.5 Years

ROI Rank

Medium

Monthly Savings
4,920
Annual Savings
59,040

Lifetime 25-Year Benefit

14.8L

Equivalent to saving the cost of a luxury apartment over 25 years.

Professional Site Audit

Estimates are based on average solar irradiance. Final ROI depends on roof orientation.

National Portal Approved Vendor
Applications Open: Feb 2026
PM Surya Ghar: Muft Bijli Yojana

Claim Your ₹78,000 Solar Subsidy

Join 1 Crore Indian households benefiting from the biggest solar revolution. We handle all government paperwork for your **Direct Bank Transfer (DBT)**.

₹78,000
Maximum Subsidy
For 3kW+ Systems
300 Units
Free Power/Month
Net Metering Benefit
Direct DBT
Bank Transfer
Within 30 Days

4-Step Subsidy Process

1

Registration

Register on National Portal with your DISCOM consumer number

2

Feasibility

DISCOM inspects your rooftop and approves installation

3

Installation

Choose registered vendor (us!), install and commission system

4

Net Metering

DISCOM installs bidirectional meter, start saving!

Ready to Go Solar?

Get a professional on-site inspection, shade analysis, and a personalized ROI report from our expert engineers.

Expert Engineers • Zero Obligation • Same-Day Response