Which Solution is Right for You?
Compare On-Grid Solar, UPS Systems, and Hybrid Solutions to find the perfect fit for your power needs and budget.
On-Grid Solar
Best for Bill Savings
Hybrid Solution
Best Overall Experience
Normal UPS
Basic Power Backup
Comparison Select Plan | On-Grid Solar Maximum Savings | RECOMMENDED CHOICE Hybrid Solution Best of Both Worlds | Normal UPS Simple Backup |
|---|---|---|---|
Initial Cost | ₹35K-50K/kW | ₹60K-80K/kW | ₹8K-15K/kVA |
Operational Cost | Near Zero | Very Low | Medium |
Backup Duration | 8-24 Hours | 2-8 Hours | |
Grid Dependency | Required | Optional | Required |
Maintenance | Minimal | Low | Medium |
ROI Timeline | 4-5 Years | 5-7 Years | N/A |
Govt. Subsidy | |||
Eco Friendly |
Calculate Your Smart
Energy Investment
Our algorithm automatically suggests the most efficient system size based on your current TANGEDCO bill slab.
Recommended
6 kW System
CO2 Offset
7.5 Tons/Yr
Trees Equivalent
337 Trees
Payback Period
5.5 Years
ROI Rank
Medium
Lifetime 25-Year Benefit
Equivalent to saving the cost of a luxury apartment over 25 years.
Professional Site Audit
Estimates are based on average solar irradiance. Final ROI depends on roof orientation.
Claim Your ₹78,000 Solar Subsidy
Join 1 Crore Indian households benefiting from the biggest solar revolution. We handle all government paperwork for your **Direct Bank Transfer (DBT)**.
4-Step Subsidy Process
Registration
Register on National Portal with your DISCOM consumer number
Feasibility
DISCOM inspects your rooftop and approves installation
Installation
Choose registered vendor (us!), install and commission system
Net Metering
DISCOM installs bidirectional meter, start saving!
